What measures does ONE-Dyas take to make this platform as sustainable as possible?

Platform N05-A will be the first offshore gas production platform in the North Sea to run entirely on wind energy. For this purpose, a cable will be laid to the nearby German wind farm Riffgat. The electrification of platform N05-A with the help of wind energy means a considerable reduction in emissions. Emissions from the production platform will be zero and for the entire project a reduction of 85 percent. With this innovation, ONE-Dyas wants to make a serious contribution to the energy transition.