What measures does ONE-Dyas take to reduce visibility?

ONE-Dyas wants to reduce the visibility of the offshore infrastructure as much as possible by choosing the lowest possible platform. The intended location offers the best opportunities for drilling multiple gas fields from a single production platform. At the same time, the northern location ensures minimum visibility from the West and East Frisian Islands.