The drilling and production platform will be located about 20 kilometres north of Schiermonnikoog and Borkum. The platform will rise approximately 50 metres above the water surface and, in clear weather, will be visible from Schiermonnikoog and Borkum. The visible size is comparable to the height of passing ships.