The platform will be the first offshore gas treatment platform in the Dutch North Sea to run entirely on wind energy. A cable will be laid to the nearby German wind farm Riffgat for this purpose. This connection will result in near-zero emissions during well drilling and natural gas production. The electricity cable is expected to be laid in the spring of 2025.